522
arrived.
The total Expenditure incurred to
39.
the 31st
of
June was
$185,816.08
Ove
the com-
-pletion of
the Erection
of
the fog signal
the
40.
41.
42.
43.
making the probable total
say $187,000 or $7,000 in excess of
Estimate.
As will be
Seem
from the explanation contained in paragraphs Nos. 35.36, and 37. the expenditure incurred and to be incurred in connection with works and appliances not included in the original Estimate amounts to $7.990,
whilst the probable
Excess over the estimate will not exceed
$7.000.
I take this opportunity of testifying to the real and energy displayed by Mr Mudie the Executive Engineer who has been in charge of this work and stating that I am
confident that
on
220
ort
Exertions
the com-
his part have been spared in its supervision and in pushing, -pletion of
the work as rapidly as practicable. The following explains the additional Estimated cost of the Slaughter House and Cattle Lairs.
Before the Excavations were commenced it was believed no
Exceptional difficulty would occur in the preparation of the proposed site.
However the excavations revealed the fact that the toe of the slope along which the retaining walls had to be erected on the Eastern, southern and western
some depth down
boundaries consisted for some
of